|
NUMBER |
TITLE |
REV |
DATE |
CHANGE NOTICES |
RID |
|
OBSOLETE OR SUPERSEDED
WORK PLANS |
|
WP-1 |
Nye County /
YMP Yucca Mountain Oversight Drilling Program |
Rev. 1 |
12/02/94 |
|
7321 |
|
WP-2 |
Monitoring
Underground Meteorological Conditions Exploratory Surface Facility
(ESF) |
Rev. 1 |
10/27/98 |
|
7321 |
|
WP-3 |
Gaseous
Geochemical Testing and Sampling in ONC#1 |
Rev. 1 |
10/20/97 |
Ch. 1 3/16/98 |
7321 |
|
WP-7 |
Death Valley
Hydrogeology Studies Program |
Rev. 2 |
11/02/98 |
|
7321 |
|
OBSOLETE OR
SUPERSEDED TEST PLANS |
|
TPN-5.1 |
Construction of Sonic Corehole NC-EWDP-19PB |
Rev. 0 |
11/15/03 |
|
7380 |
|
TPN-5.2 |
Data Collection at the Amargosa Valley Science and Technology Park
Production Well |
Rev. 0 |
11/20/03 |
|
7380 |
|
TPN-5.3 |
Construction of Sonic Corehole NC-EWDP-22PC |
Rev. 1 |
11/13/04 |
|
7380 |
|
TPN-5.4 |
Data Collection at the U.S. Department of Energy Volcanic Hazard
Boreholes in the Vicinity of Lower Fortymile Wash |
Rev. 0 |
11/07/05 |
|
7380 |
|
TPN-6.1 |
Thermal Logging in Early Warning Drilling Program Wells Using
Sensornet Equipment |
Rev. 0 |
6/19/06 |
|
7380 |
|
TPN-6.2 |
Thermal Logging in Early Warning Drilling Program Wells and
Laboratory Using Agilent Distributed Temperature Perturbation Sensor
Technology |
Rev. 0 |
9/18/07 |
|
7380 |
|
TPN-8.1 |
Constant Head Saturated Hydraulic Conductivity Measurements on
Repacked Core Samples |
Rev. 0 |
4/01/04 |
|
7380 |
|
TPN-9.1 |
Pump Test of Individual Screens in NC-EWDP-22S |
Rev. 0 |
7/30/03 |
|
7380 |
|
TPN-9.2 |
Single-Well Push/Pull Tracer Tests at Well NC-EWDP-22S |
Rev. 0 |
11/18/04 |
|
7380 |
|
TPN-9.3 |
Cross-Hole, Multiple-Well Tracer Test at Site 22 |
Rev. 0 |
11/18/04 |
|
7380 |
|
TPN-9.5 |
Natural Gradient Cross-Hole Tracer Test at Site 22 |
Rev. 0 |
01/31/06 |
Ch. 1 1/31/06 |
7380 |
|
TPN-11.1 |
Groundwater Sampling and Analysis of Early Warning Drilling Program
(EWDP) Wells, August through November 2003 |
Rev. 0 |
9/26/03 |
|
7380 |
|
TPN-11.2 |
Groundwater Sampling and Analysis of WT Wells, April 2005 |
Rev. 0 |
4/19/05 |
|
7380 |
|
TPN-11.3 |
Groundwater Sampling and Analysis of Early Warning Drilling Program
Wells, 2005 to 2006 |
Rev. 0 |
9/15/05 |
Ch. 1 4/10/06 |
7380 |
|
OBSOLETE
OR SUPERSEDED TECHNICAL
PROCEDURES |
|
TP-8.2 |
Thin Section Preparation Procedure |
Rev. 0 |
6/16/00 |
|
7385 |
|
TP-8.3 |
Sample Collection, Identification and Control for
Mineralogy-Petrology Studies |
Rev. 0 |
9/15/00 |
|
7385 |
|
TP-8.4 |
Binocular Microscope for Fracture and VUG Mineralogy Studies |
Rev. 0 |
9/15/00 |
|
7385 |
|
TP-8.5 |
Petrography and Modal Analysis Procedure |
Rev. 0 |
9/25/00 |
|
7385 |
|
TP-8.6 |
X-Ray Diffraction Procedure |
Rev. 0 |
10/15/00 |
|
7385 |
|
TP-8.7 |
SEM, TEM, Electron Microprobe Procedure |
Rev. 0 |
11/01/00 |
|
7385 |
|
TP-8.9 |
Differential Spectrometry (K, U, T) for Core, Cuttings, and Other
Samples |
Rev. 0 |
11/06/00 |
|
7385 |
|
TP-9.1 |
Computer Modeling Quality Assurance Procedure |
Rev. draft |
4/30/93 |
|
7385 |
|
TP-9.3 |
Instrumentation, Calibration, Collection and Processing of Data in
ESF Tunnels |
Rev. 0 |
10/27/98 |
|
7385 |
|
TP-9.4 |
Gas Sampling Procedure of ONC#1 and Other Westbay Instrumented Wells |
Rev. 1 |
10/20/97 |
Ch. 2 11/13/98 |
7385 |