The files listed below are some obsolete or superseded Nye County Nuclear Waste Repository Project Office (NWRPO) Quality Assurance documents.  A complete set of obsolete or superseded documents are archived in the NWRPO Quality Assurance Records Center. 

 Active QA policies, plans, and procedures are also available online.

NUMBER TITLE REV DATE

CHANGE NOTICES

RID
OBSOLETE OR SUPERSEDED WORK PLANS
WP-1 Nye County / YMP Yucca Mountain Oversight Drilling Program Rev. 1 12/02/94   7321
WP-2 Monitoring Underground Meteorological Conditions Exploratory Surface Facility (ESF) Rev. 1 10/27/98   7321
WP-3 Gaseous Geochemical Testing and Sampling in ONC#1 Rev. 1 10/20/97 Ch. 1 3/16/98 7321
WP-7 Death Valley Hydrogeology Studies Program Rev. 2 11/02/98   7321
 OBSOLETE OR SUPERSEDED TEST PLANS
TPN-5.1 Construction of Sonic Corehole NC-EWDP-19PB Rev. 0 11/15/03   7380
TPN-5.2 Data Collection at the Amargosa Valley Science and Technology Park Production Well Rev. 0 11/20/03   7380
TPN-5.3 Construction of Sonic Corehole NC-EWDP-22PC Rev. 1 11/13/04   7380
TPN-5.4 Data Collection at the U.S. Department of Energy Volcanic Hazard Boreholes in the Vicinity of Lower Fortymile Wash Rev. 0 11/07/05   7380
TPN-6.1 Thermal Logging in Early Warning Drilling Program Wells Using Sensornet Equipment Rev. 0 6/19/06   7380
TPN-6.2 Thermal Logging in Early Warning Drilling Program Wells and Laboratory Using Agilent Distributed Temperature Perturbation Sensor Technology Rev. 0 9/18/07   7380
TPN-8.1 Constant Head Saturated Hydraulic Conductivity Measurements on Repacked Core Samples Rev. 0 4/01/04   7380
TPN-9.1 Pump Test of Individual Screens in NC-EWDP-22S Rev. 0 7/30/03   7380
TPN-9.2 Single-Well Push/Pull Tracer Tests at Well NC-EWDP-22S Rev. 0 11/18/04   7380
TPN-9.3 Cross-Hole, Multiple-Well Tracer Test at Site 22 Rev. 0 11/18/04   7380
TPN-9.5 Natural Gradient Cross-Hole Tracer Test at Site 22 Rev. 0 01/31/06 Ch. 1 1/31/06 7380
TPN-11.1 Groundwater Sampling and Analysis of Early Warning Drilling Program (EWDP) Wells, August through November 2003 Rev. 0 9/26/03   7380
TPN-11.2 Groundwater Sampling and Analysis of WT Wells, April 2005 Rev. 0 4/19/05   7380
TPN-11.3 Groundwater Sampling and Analysis of Early Warning Drilling Program Wells, 2005 to 2006 Rev. 0 9/15/05 Ch. 1 4/10/06 7380
   OBSOLETE OR SUPERSEDED  TECHNICAL PROCEDURES
TP-8.2 Thin Section Preparation Procedure Rev. 0 6/16/00   7385
TP-8.3 Sample Collection, Identification and Control for Mineralogy-Petrology Studies Rev. 0 9/15/00   7385
TP-8.4 Binocular Microscope for Fracture and VUG Mineralogy Studies Rev. 0 9/15/00   7385
TP-8.5 Petrography and Modal Analysis Procedure Rev. 0 9/25/00   7385
TP-8.6 X-Ray Diffraction Procedure Rev. 0 10/15/00   7385
TP-8.7 SEM, TEM, Electron Microprobe Procedure Rev. 0 11/01/00   7385
TP-8.9 Differential Spectrometry (K, U, T) for Core, Cuttings, and Other Samples Rev. 0 11/06/00   7385
TP-9.1 Computer Modeling Quality Assurance Procedure Rev. draft 4/30/93   7385
TP-9.3 Instrumentation, Calibration, Collection and Processing of Data in ESF Tunnels Rev. 0 10/27/98   7385
TP-9.4 Gas Sampling Procedure of ONC#1 and Other Westbay Instrumented Wells Rev. 1 10/20/97 Ch. 2 11/13/98 7385

 