| PHOTOS |
Clicking on the photo thumbnails will produce a full resolution image for
downloading and printing. To download an image, move your cursor over any part of
the image and right click with your mouse. Select the "Save Image As"
option. Another window will appear; choose a folder and click the "SAVE"
option. |

283KB |
EWDP Field Supervisor, Tom
Buqo, discussing log cuttings at NC-EWDP-9SX with EWDP Field Geologist Ken Donnellson.
|

277KB |
Layne-Christensen Dual Wall
Hammer Rig during operations at NC-EWDP-9SX.
|

288KB |
Layne-Christensen reverse
circulation hammer rig operating at NC-EWDP-9SX showing large hoses for discharging
cuttings and formation water.
|

310KB |
NC-EWDP-9SX
|

167KB |
Great Basin Drilling Services
pump rig installing pump casing in NC-EWDP-9SX for a 48 hour pump test.
|

264KB |
Well head setup during 48 hour
pump test at NC-EWDP-9SX.
|

245KB |
Discharge at NC-EWDP-9SX during
48 hour pump test.
|

181KB |
Water sampling during 48 hour
pump test at well NC-EWDP-9SX.
|

294KB |
Water discharge
during 48 hour
pump test at NC-EWDP-9SX. Down hole spinner log is operating during the test.
|

275KB |
Nye County contract geologists
Mike Cline and Jamie Walker testing down hole water level meter during pump test at
NC-EWDP-9SX.
|

285KB |
Cutting
samples from NC-EWDP-9SX paleo-discharge beds.
|

261KB |
Hard specimen recovered during
drilling of NC-EWDP-9SX by Layne-Christensen hammer rig showing calcite-silica fracture
fillings.
|